Energy is the first constraint on AI. A model can be moved. Racks can be swapped. Megawatts cannot be produced by a software update.

Power is designed before anything else. Every other system follows the connection.

ArchitectureGrid, generation, storage and photovoltaics.

Leonardo da Vinci · Madrid Codices · Biblioteca Nacional de España

Grid connection, combined heat and power, storage and photovoltaics form one stack. The adit joins it as heat: water at 10–12 °C is a source for a heat pump in winter and free cooling in summer, never electricity. Each layer carries its own status and its own date. They are never added into a single number.

Energy

  1. GRID
  2. CHP
  3. STORAGE
  4. PV
  5. LOAD
Energy flow, four layers

SpecificationEnergy

Stand: 08/2026

Grid connection, Blankenburg110 kV / 60 MW1
Combined heat and power~25 MWth2
Combined heat and power, electrical30 MW el3
Transformers, campus2 × 63 MVA4
Grid connection, Quedlinburg1 MW5
Transformer2 MVA6
Storage capacity2.33 MWh7
Storage power1.05 MW8
Photovoltaics450 kWp9
Mine water, thermal capacity1,6 MWth10
Photovoltaics, campus – an area-consistent figureOpen · Engineering
Mine water – abstraction permit, measured temperature and flowOpen · Legal and engineering

01 · EnergyProof

Documents · Technical overview · not yet published.

Quedlinburg has its own existing connection, storage and roof. Blankenburg's connection request was filed in March 2026 and is in review.

Control

Metering is continuous and per layer. A layer that is planned reports as planned.

Notes

  1. 1110 kV / 60 MW – SUBMITTED / IN PROCESS (SUBMITTED) · effective 03/2026 · source: Grid connection application · verified 06.08.2026
  2. 2~25 MWth – DESIGN BASIS (DESIGN BASIS) · effective 04/2026 · source: Heat concept · verified 08.08.2026
  3. 330 MW el – DESIGN BASIS (DESIGN BASIS) · effective 07/2026 · source: Technical concept · verified 13.08.2026
  4. 42 × 63 MVA – DESIGN BASIS (DESIGN BASIS) · effective 07/2026 · source: Technical concept · verified 13.08.2026
  5. 51 MW – VERIFIED EXISTING (EXISTING) · effective 08/2026 · source: Project data sheet · verified 06.08.2026
  6. 62 MVA – VERIFIED EXISTING (EXISTING) · effective 08/2026 · source: Site survey · verified 06.08.2026
  7. 72.33 MWh – VERIFIED EXISTING (EXISTING) · effective 08/2026 · source: Technical concept · verified 22.08.2026
  8. 81.05 MW – VERIFIED EXISTING (EXISTING) · effective 08/2026 · source: Project data sheet · verified 09.08.2026
  9. 9450 kWp – VERIFIED EXISTING (EXISTING) · effective 08/2026 · source: Technical concept · verified 22.08.2026
  10. 101,6 MWth – DESIGN BASIS (CALCULATED) · effective 08/2026 · source: Technical concept · verified 21.08.2026

Document status · Revision 1.0 · Last factual review 22 Aug 2026