Skip to content

Press.

Press

STAND 08/2026

Two buildings in the Harz, one of them standing. Dated facts, named sources, and a person who answers.

Latest coverage

MDR Sachsen-Anhalt · 21 August 2026

MDR reports on Quedlinburg’s transformation into an AI infrastructure hub.

A physical proof point for the Black Vault infrastructure model.

From industrial landmark to sovereign AI infrastructure.

Public broadcaster MDR reports on the transformation of Quedlinburg’s former Mertik tower into a new energy and computing asset.

The seven-storey tower clad in photovoltaic modules
The press briefing in front of the building, officials and the developer before the Black Vault banner

450 kWp

Solar façade

2.33 MWh

Battery storage

AI compute

Data centre

Planned

Once home to one of the city’s largest employers, the seven-storey building is being re-engineered around a new infrastructure stack: a photovoltaic façade, battery storage, and a planned data centre for decentralised AI infrastructure. The town’s municipal utility gave its agreement at the same briefing.

Quedlinburg demonstrates the principle the whole model rests on. Energy and compute are not separate assets. They belong to the same physical architecture.

We are clearing an eyesore – and here we have a project of the future.

Frank Ruch, Mayor of Quedlinburg, at the press briefingFrank RuchMayor of Quedlinburg

„Ich bin sehr zufrieden, weil wir einen Schandfleck bereinigen und weil wir hier ein Projekt der Zukunft haben.“

ReleasesWhat we have announced, and when.

The same dated register as the project log. One list, read twice – a press page that disagrees with the log is the error a journalist notices first.

Stand: 08/2026

  1. 05.08.2026completeBlack Vault Blankenburg GmbH foundedNotarial founding. The site now has its own company, as every project does.
  2. 22.06.2026completeStrategic partner meeting, BlankenburgTown, grid operator and engineering at one table.
  3. 04/2026completeLetter of intent signed with the town of BlankenburgThe exact day is not published; the month is.
  4. 03/2026in progressGrid connection request filed with Avacon110 kV, 60 MW. Filed 03/2026. The decision is a separate entry.

CoverageWritten about the building.

Coverage of the building as an energy project, before the compute layer. Headlines reproduced with attribution, rights clearance pending; the photographs on the cards are our own.

Harzer Volksstimme

Modellprojekt für Harzkreis

11.06.2025

Immobilien Aktuell

Mertik-Hochhaus in Quedlinburg: Verfallenes Bürogebäude wird zum Energie-Hochhaus

2024

Project factsThe figures, with their status.

Every figure here carries what kind of figure it is. EXISTING is measured and running. DESIGN BASIS is engineering, not a measurement. TARGET is neither. Nothing on this site is quoted without one.

The Cube, addressKlopstockweg 10a · Quedlinburg1
Existing site connection1 MW2
Storage, installed2.33 MWh3
Photovoltaics, installed450 kWp4
Campus, addressMichaelsteiner Straße 28a · Blankenburg (Harz)5
Campus grid connection110 kV / 60 MW6
Heat, households equivalent500–1,500 household equivalents7

Media kitWhat the kit contains.

A curated media selection is available on request. Photographs are ours and cleared for editorial use with the credit line given on each.

  • 01Aerial photography of the Cube, 4K, summer 2026
  • 02The building as it stands: façade, roof, plant rooms
  • 03Drawings cleared for publication, with revision and date
  • 04Wordmark and logotype, vector
  • 05Boilerplate in German and English, and this page's figures

Available on request by email.

ContactPress enquiries.

office@blackvault.global

Write with a deadline in the message and you will get an answer that fits it. Site visits at the Cube are possible; the building stands and can be walked into.

Write to the press desk

Notes

  1. 1Klopstockweg 10a · Quedlinburg – VERIFIED EXISTING (EXISTING) · effective 08/2026 · source: Cadastral data · verified 29.07.2026
  2. 21 MW – VERIFIED EXISTING (EXISTING) · effective 08/2026 · source: Project data sheet · verified 06.08.2026
  3. 32.33 MWh – VERIFIED EXISTING (EXISTING) · effective 08/2026 · source: Technical concept · verified 22.08.2026
  4. 4450 kWp – VERIFIED EXISTING (EXISTING) · effective 08/2026 · source: Technical concept · verified 22.08.2026
  5. 5Michaelsteiner Straße 28a · Blankenburg (Harz) – VERIFIED EXISTING (EXISTING) · effective 08/2026 · source: Project data sheet · verified 07.08.2026
  6. 6110 kV / 60 MW – SUBMITTED / IN PROCESS (SUBMITTED) · effective 03/2026 · source: Grid connection application · verified 06.08.2026
  7. 7500–1,500 household equivalents – DESIGN BASIS (DESIGN BASIS) · effective 06/2026 · source: Heat concept · verified 06.08.2026