Skip to content
All systems

Compute

02 · Core systems

An environment for accelerators: power, liquid, density.

We build the environment. The customer brings the machines.

ArchitecturePower, liquid and density for accelerators.

Direct-to-chip liquid, closed containment, and a boundary drawn at the rack. What crosses that boundary is contractual, not architectural.

Compute

  1. POWER
  2. LIQUID
  3. RACK
  4. ACCELERATOR

SpecificationCompute

Stand: 08/2026

IT load, Blankenburg Phase 150 MW IT1
Rack density, campus~50 kW/Rack2
IT load per hall25 MW IT3
Racks per hall504 Racks4
Hall envelope60 × 42 m5
Rack density, Quedlinburg13.6 kW/Rack6
Class, Quedlinburg1–3 MW class7
White space264 m²8
Floor loading600 kg/m²9
Customer hardware boundary, as a written clauseOpen · CTO

02 · ComputeProof

Documents · Capacity brief · not yet published.

Quedlinburg's floors are measured, including their loading. Blankenburg's IT load is a design basis figure and marked as one.

Control

Density is a property of the building. It is fixed before a rack is ordered.

Notes

  1. 150 MW IT – DESIGN BASIS (DESIGN BASIS) · effective 06/2026 · source: Project data sheet · verified 06.08.2026
  2. 2~50 kW/Rack – DESIGN BASIS (DESIGN BASIS) · effective 07/2026 · source: Technical concept · verified 13.08.2026
  3. 325 MW IT – DESIGN BASIS (DESIGN BASIS) · effective 07/2026 · source: Technical concept · verified 13.08.2026
  4. 4504 Racks – DESIGN BASIS (DESIGN BASIS) · effective 07/2026 · source: Technical concept · verified 13.08.2026
  5. 560 × 42 m – DESIGN BASIS (DESIGN BASIS) · effective 07/2026 · source: Technical concept · verified 13.08.2026
  6. 613.6 kW/Rack – DESIGN BASIS (CALCULATED) · effective 07/2026 · source: Cooling calculation · verified 13.08.2026
  7. 71–3 MW class – DESIGN BASIS (DESIGN BASIS) · effective 08/2026 · source: Project data sheet · verified 06.08.2026
  8. 8264 m² – DESIGN BASIS (CALCULATED) · effective 08/2026 · source: Technical concept · verified 06.08.2026
  9. 9600 kg/m² – VERIFIED EXISTING (SIGNED REPORT) · effective 01/2023 · source: Structural drawing · verified 31.07.2026

Document status · Revision 1.0 · Last factual review 13 Aug 2026

Where else to go.

The rest of the site, including the parts a diligence reader wants and the parts the law requires.