Systems.
Systems
STAND 08/2026
Seven systems carry a data centre, and one more decides what the ground can host later. Each is designed, measured and dated on its own.
The section
Core systems
Seven carry the building. The eighth is a property of the ground, and it is shown apart because it is not on offer.
Advanced – Quantum reserved zone. Some conditions are bought with the land or not at all.
Stand: 08/2026















