The waste heat belongs to the city. It leaves through a pipe to the municipal network.
ArchitectureHeat export potential up to 35 MWth at the transfer point (DESIGN BASIS).
Recovery at the machines, a transfer station, and roughly five hundred metres of pipe to the municipal network. The quantities below are Blankenburg Phase 1.
Heat
- MACHINES
- RECOVERY
- TRANSFER
- NETWORK
SpecificationHeat
Stand: 08/2026
04 · HeatProof
Documents · Heat sheet · not yet published.
The transfer point sits on Flurstück 1492 N. The route and the temperatures are design basis.
Control
Delivered heat is metered at the transfer station, by the network operator as well as by us.
04 · HeatApplication by location
Notes
- 1up to 35 MWth – DESIGN BASIS (DESIGN BASIS) · effective 06/2026 · source: Heat concept · verified 06.08.2026
- 2~10 MWth – DESIGN BASIS (DESIGN BASIS) · effective 04/2026 · source: Heat concept · verified 08.08.2026
- 3~25 MWth – DESIGN BASIS (DESIGN BASIS) · effective 04/2026 · source: Heat concept · verified 08.08.2026
- 480–150 GWh/a – DESIGN BASIS (CALCULATED) · effective 04/2026 · source: Heat concept · verified 01.09.2026
- 580–105 °C – DESIGN BASIS (DESIGN BASIS) · effective 06/2026 · source: Heat concept · verified 07.08.2026
- 670–90 °C – DESIGN BASIS (DESIGN BASIS) · effective 04/2026 · source: Heat concept · verified 08.08.2026
- 7~500 m – DESIGN BASIS (DESIGN BASIS) · effective 04/2026 · source: Heat concept · verified 08.08.2026
- 8500–1,500 household equivalents – DESIGN BASIS (DESIGN BASIS) · effective 06/2026 · source: Heat concept · verified 06.08.2026
Document status · Revision 1.0 · Last factual review 01 Sept 2026